Friday 27 July 2018

Wall extension, arch and rose wrangling

When we get the decking material from Bunnings for the walkway, we also pick up the struts and louvres ordered a month or so ago to finish off the wall to match the one between us and our neighbour at the front. Peter realises that some additional brickwork will be needed and does a neat bricklaying job. A day passes while we wait for the mortar to dry, then he constructs the screen and bolts it to the gatepost at one end, the new brickwork at the other. Looks great, and matches the rest nicely.
On Friday we start the last task, of erecting a trellis arch over the gate. This was purchased from Bunnings months ago, but had to wait for the wall to be completed. It's another flat-pack, designed to produce a free-standing arch about 2m high. We shorten and adapt the pieces to construct something that will bolt to the wall on either side of the gate. It's dark by the time he is putting on the last fastenings, and then at long last she wrangles the rather vicious but lovely Nancy Hayward climbing rose, hoisting back up on to the wall, threading through the louvres and tying it on, and weaving a couple of long branches through the trellis arch.

All done and looking good for the party the next day.


No comments:

Post a Comment