Over the weekend and today ground is levelled, plants are trimmed, holes are dug, stumps inserted, bearers bolted and decking planks screwed down.
A blog recording the progress of our renovations of "the guest wing".
Monday, 23 July 2018
Joining the dots, or rather houses
With a daytime party looming, we need to resolve the connecting walkway between houses. She has a vision of rural-looking stepping stones made from slices of trees, and has been promised such slices by two people with farms. As these have failed to materialise, we start looking at alternatives - some kind of bridge structure. Flat-pack ones are available, but not long enough, so it's off to Bunnings to buy some mirbau decking strips and treated pine for stumps and bearers.
Over the weekend and today ground is levelled, plants are trimmed, holes are dug, stumps inserted, bearers bolted and decking planks screwed down.
As a last touch she puts a paver as a jumping off-point and extends the gravel around it.
Over the weekend and today ground is levelled, plants are trimmed, holes are dug, stumps inserted, bearers bolted and decking planks screwed down.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment